Operational Test of the Power Interlocks and Status Monitoring A320

1. Reason for the Job

Self explanatory

2. Job Set-up Information

A. Referenced Information

REFERENCEDESIGNATION
Ref. 24-41-00-861-002-AEnergize the Aircraft Electrical Circuits from the External Power
Ref. 24-41-00-861-002-A01Energize the Aircraft Electrical Circuits from the APU
Ref. 24-41-00-861-002-A02Energize the Aircraft Electrical Circuits from Engine 1(2)
Ref. 24-41-00-862-002-ADe-energize the Aircraft Electrical Circuits Supplied from the External Power
Ref. 24-41-00-862-002-A01De-energize the Aircraft Electrical Circuits Supplied from the APU
Ref. 24-41-00-862-002-A02De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
Ref. 31-32-00-860-008-AProcedure to Get Access to the SYSTEM REPORT/TEST/INST Page
Ref. 31-60-00-860-001-AEIS Start Procedure
Ref. 31-60-00-860-002-AEIS Stop Procedure

3. Job Set-up

SUBTASK 31-33-00-861-050-A

A. Aircraft Maintenance Configuration

(1) Energize the aircraft electrical circuits Ref. AMM TASK 24-41-00-861-002.

(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) Ref. AMM TASK 31-60-00-860-001.

(3) Energize the CFDS Ref. AMM TASK 31-32-00-860-008.

SUBTASK 31-33-00-865-050-A

B. Make sure that this(these) circuit breaker(s) is(are) closed:

PANELDESIGNATIONFINLOCATION
49VUCOM/CVR/CTL4RKE13
121VURCDR/ACCLRM9TUK18
121VUAIDS & RCDR/QAR14TUK17
121VURCDR/DFDR7TUK16
121VUAIDS & RCDR/FDIMU5TVK15

4. Procedure

SUBTASK 31-33-00-710-050-C

A. Do the Power Interlocks and System Monitoring Test

ACTIONRESULT
1.On the control panel 21VU:On the control panel 21VU:
-Push the GND/CTL button.-The blue ON legend comes on.
2.On the MCDU 3 CA1:On the MCDU screen 3CA1:
-Set the MCDU menu.-The MCDU menu shows.
-Push the line key adjacent to the <CFDS.-The CFDS page shows.
-Push the line key adjacent to the <SYSTEM REPORT/TEST.-The SYSTEM REPORT/TEST page shows.
-Push the line key adjacent to the INST>.-The SYSTEM REPORT/TEST INST page shows.
-Push the line key adjacent to the <FDIU.-The DFDRS menu shows.
-Push the line key adjacent to the <GND SCANNING.-The GROUND SCANNING page shows with NO FAULT message or with a fault message showing the equipment at fault and the ATA Ref.
3.On the control panel 21VU:On the control panel 21VU:
-Push the GND CTL button.-The blue ON legend goes off.

5. Close-up

SUBTASK 31-33-00-862-051-A

A. Put the aircraft back to its initial configuration.

(1) De-energize the CFDS Ref. AMM TASK 31-32-00-860-008.

(2) Do the EIS stop procedure Ref. AMM TASK 31-60-00-860-002.

(3) De-energize the aircraft electrical circuits Ref. AMM TASK 24-41-00-862-002.

Read me first

All instructions and limitations given in those documents that relate to the resetting of systems both on the ground and in the air must be respected. No reset should be attempted without a thorough appreciation of the technical ramifications. No more than one computer should be reset at any one time. No reset should be attempted in flight unless specifically permitted by the QRH. Maintenance messages remaining after a reset require engineering investigation.

If you encounter an ECAM warning or caution that is not available on our website, please take a photo and send it to our Telegram.

Likewise, if you detect any discrepancies on the site, you can report them directly in our Telegram.

  • Рубрики
  • Social Icons

    Gallery