Operational Test of the Windshear Function A320

WARNING: MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.

1.Reason for the Job

Self explanatory

2. Job Set-up Information

A. Work Zones and Access Panels

ZONE/ACCESSZONE DESCRIPTION
210CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD

B. Referenced Information

REFERENCEDESIGNATION
Ref. 24-41-00-861-002-AEnergize the Aircraft Electrical Circuits from the External Power
Ref. 24-41-00-861-002-A01Energize the Aircraft Electrical Circuits from the APU
Ref. 24-41-00-861-002-A02Energize the Aircraft Electrical Circuits from Engine 1(2)
Ref. 24-41-00-862-002-ADe-energize the Aircraft Electrical Circuits Supplied from the External Power
Ref. 24-41-00-862-002-A01De-energize the Aircraft Electrical Circuits Supplied from the APU
Ref. 24-41-00-862-002-A02De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
Ref. 31-32-00-860-001-AProcedure to Get Access to the SYSTEM REPORT/TEST Menu Page
Ref. 31-60-00-860-001-AEIS Start Procedure
Ref. 31-60-00-860-002-AEIS Stop Procedure

3. Job Set-up

SUBTASK 22-60-00-860-056-A

A. Aircraft Maintenance Configuration

(1) Energize the aircraft electrical circuits Ref. AMM TASK 24-41-00-861-002.

(2) Make sure that the ventilation of the electronics racks operates correctly.

(3) On the overhead panel, on the ADIRS CDU:

— set the OFF/NAV/ATT selector switches to NAV.

(4) On the center pedestal, on the SWITCHING panel 8VU:

— set the AIR DATA switch to CAPT/3, F/0/3 then NORM position (this action is mandatory to do the test correctly).

(5) On the overhead panel, on the FLT CTL panels 23VU and 24VU:

— make sure that the FAC 1 and FAC 2 pushbutton switches are pushed (the FAULT and OFF legends are off).

(6) Do the EIS start procedure Ref. AMM TASK 31-60-00-860-001.

4.Procedure

SUBTASK 22-60-00-710-053-A

A. Operational Test of the Windshear Function

Ref. Fig. Procedure Test

NOTE:   You can stop the windshear test when it is necessary. To stop the test, push the line key adjacent to the END OF TEST indication, (the AFS MAIN MENU page comes into view).

NOTE:   To engage or disengage the FAC 1(2), push the FAC1(2) pushbutton switch on the panel 23VU(24VU).

ACTIONRESULT
1.On the center pedestal, on the MCDU:
-get the SYSTEM REPORT/TEST page Ref. AMM TASK 31-32-00-860-001.The SYSTEM REPORT/TEST page comes into view.
2.On the SYSTEM REPORT/TEST page:
-push the line key adjacent to the AFS indication.The AFS MAIN MENU page comes into view.
3.On the AFS MAIN MENU page:
-push the line key adjacent to the WINDSHEAR TEST indication.The AFS/WINDSHEAR TEST-1 page comes into view.
4.On the AFS/WINDSHEAR TEST-1 page:-obey the instructions given on the MCDU.NOTE:Make sure that you do this step in less than 2.5 minutes. If not, start the windshear test again.
-then, push the NEXT PAGE function key.The AFS/WINDSHEAR TEST-2 page comes into view.
5.On the AFS/WINDSHEAR TEST-2 page:-obey the instructions given on the MCDU.
-then, push the line key adjacent to the YES indication if the result of the visual and aural checks are correct.The AFS/WINDSHEAR TEST-3 page comes into view.
6.On the AFS/WINDSHEAR TEST-3 page:-obey the instructions given on the MCDU.NOTE:When the predictive windshear function is active:-on the EWD, make sure that the REAC W/S DET FAULT message (and not the WINDSHEAR DET FAULT message) is shown.-On the STATUS page, make sure that the REAC W/S DET message (and not the WINDSHEAR DET FAULT message) is shown.
-then, push the line key adjacent to the YES indication if the result of the visual checks are correct.The AFS/WINDSHEAR TEST-4 page comes into view.
7.On the AFS/WINDSHEAR TEST-4 page:-obey the instructions given on the MCDU.
-then, push the NEXT PAGE function key.The AFS/WINDSHEAR TEST-5 page comes into view.
8.On the AFS/WINDSHEAR TEST-5 page:-obey the instructions given on the MCDU.
-then, push the line key adjacent to the YES indication if the result of the visual and aural checks are correct.The AFS/WINDSHEAR TEST-6 page comes into view.
9.On the AFS/WINDSHEAR TEST-6 page:-obey the instructions given on the MCDU.NOTE:When the predictive windshear function is active:-on the EWD, make sure that the REAC W/S DET FAULT message (and not the WINDSHEAR DET FAULT message) is shown.-On the STATUS page, make sure that the REAC W/S DET message (and not the WINDSHEAR DET FAULT message) is shown.
-then, push the line key adjacent to the YES indication if the result of the visual checks are correct.The AFS/WINDSHEAR TEST-7 page comes into view.
10.On the AFS/WINDSHEAR TEST-7 page:
-obey the instructions given on the MCDU.The WINDSHEAR TEST OK indication comes into view.
11.On the MCDU:-push the line key adjacent to the RETURN indication.

5. Close-up

SUBTASK 22-60-00-860-057-A

A. Put the aircraft back to its initial configuration.

(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.

(2) On the overhead panel, on the ADIRS CDU, set the OFF/NAV/ATT selector switches to OFF.

(3) Do the EIS stop procedure Ref. AMM TASK 31-60-00-860-002.

(4) De-energize the aircraft electrical circuits Ref. AMM TASK 24-41-00-862-002.

Read me first

All instructions and limitations given in those documents that relate to the resetting of systems both on the ground and in the air must be respected. No reset should be attempted without a thorough appreciation of the technical ramifications. No more than one computer should be reset at any one time. No reset should be attempted in flight unless specifically permitted by the QRH. Maintenance messages remaining after a reset require engineering investigation.

If you encounter an ECAM warning or caution that is not available on our website, please take a photo and send it to our Telegram.

Likewise, if you detect any discrepancies on the site, you can report them directly in our Telegram.

  • Рубрики
  • Social Icons

    Gallery