OOR _____POS DET 2 FAULT
CABIN PRESSURE CONTROLLER (CPC)
— RESET PROCEDURE—
- Reset breakers CPC 1 and CPC 2 on the LH and RH reset panels.
- Perform system test of PSCU on the MCDU (ATA 52).
MEL STATUS: MEL 52-71-01-B



OOR _____POS DET 2 FAULT
CABIN PRESSURE CONTROLLER (CPC)
— RESET PROCEDURE—
MEL STATUS: MEL 52-71-01-B


