TASK 21-61-00-710-001-A

Operational test of the pack temperature control

For details see amm effectivity for your A/C

— RESET PROCEDURE—

21-63-04 Air Conditioning System Controller Channel (COND CTL 1(2)-A(B)) MMEL

21-61-34 PB 401 Air-Conditioning System Controller replace

TSM 21-61-00-810-898-A AIR COND CTL 1(2)-A(b) FAULT



Добавить комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *

Read me first

All instructions and limitations given in those documents that relate to the resetting of systems both on the ground and in the air must be respected. No reset should be attempted without a thorough appreciation of the technical ramifications. No more than one computer should be reset at any one time. No reset should be attempted in flight unless specifically permitted by the QRH. Maintenance messages remaining after a reset require engineering investigation.

Recent Posts

Gallery