Interface and Power-Up Test of the CIDS A320

1. Reason for the Job

Self explanatory

2. Job Set-up Information

A. Work Zones and Access Panels

ZONE/ACCESSZONE DESCRIPTION
200UPPER HALF FUSELAGE

B. Referenced Information

REFERENCEDESIGNATION
Ref. 23-73-00-861-001-AEnergize the Cabin Intercommunication Data System (CIDS)
Ref. 24-41-00-861-002-AEnergize the Aircraft Electrical Circuits from the External Power
Ref. 24-41-00-861-002-A01Energize the Aircraft Electrical Circuits from the APU
Ref. 24-41-00-861-002-A02Energize the Aircraft Electrical Circuits from Engine 1(2)
Ref. 24-41-00-862-002-ADe-energize the Aircraft Electrical Circuits Supplied from the External Power
Ref. 24-41-00-862-002-A01De-energize the Aircraft Electrical Circuits Supplied from the APU
Ref. 24-41-00-862-002-A02De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
Ref. 31-32-00-860-003-AProcedure to Get Access to the SYSTEM REPORT/TEST/COM Page
Ref. 31-60-00-860-001-AEIS Start Procedure
Ref. 31-60-00-860-002-AEIS Stop Procedure

3. Job Set-up

SUBTASK 23-73-00-860-211-A

A. Aircraft Maintenance Configuration

(1) Energize the aircraft electrical circuits Ref. AMM TASK 24-41-00-861-002.

(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only) Ref. AMM TASK 31-60-00-860-001.

(3) Make sure that the Cabin Intercommunication Data System (CIDS) is energized Ref. AMM TASK 23-73-00-861-001.

(4) Energize the Centralized Fault Display System (CFDS) Ref. AMM TASK 31-32-00-860-003.

(5) Make sure that a minimum of one cabin door is open.

SUBTASK 23-73-00-860-212-A

B. Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU is in the OFF position.

SUBTASK 23-73-00-865-241-A

C. Make sure that this(these) circuit breaker(s) is(are) closed:

PANELDESIGNATIONFINLOCATION
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
49VUAIR COND/CAB/PRESS/CTL11HLD09
121VUENGINE/ENG2/FADEC B4KS2Q40
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
122VUAIR COND/CAB PRESS/CTL/22HLY22

4. Procedure

SUBTASK 23-73-00-740-061-A

A. Do this test

ACTIONRESULT
1.On the MCDU:On the MCDU:
-push the MCDU MENU pushbutton.-the MCDU MENU page shows.
-push the CFDS related line select key.-the CFDS page shows.
-push the SYSTEM REPORT/TEST line select key.-the SYSTEM REPORT/TEST page shows.
-push the COM related line select key.-the SYSTEM REPORT/TEST COM page shows.
-push the CIDS1 related line select key.-the CIDS1 page shows.
-push the SYSTEM TESTS related line select key.-the CIDS1 SYSTEM TESTS DIR1 ACTIVE page shows.
-push the INTERFACE + POWER-UP TEST line select key.-the CIDS1 INTERFACE + POWER-UP TEST, DIR1 ACTIVE page with the message ‘TEST IN PROGRESS 6 MIN’ shows.
-if the Interface and Power-Up test is complete, the message ‘TEST OK’ shows.
-push the MCDU MENU pushbutton.-the MCDU MENU page shows.

5. Close-up

SUBTASK 23-73-00-860-213-A

A. Put the aircraft back to its initial configuration.

(1) Do the EIS stop procedure Ref. AMM TASK 31-60-00-860-002.

(2) De-energize the aircraft electrical circuits Ref. AMM TASK 24-41-00-862-002.

Read me first

All instructions and limitations given in those documents that relate to the resetting of systems both on the ground and in the air must be respected. No reset should be attempted without a thorough appreciation of the technical ramifications. No more than one computer should be reset at any one time. No reset should be attempted in flight unless specifically permitted by the QRH. Maintenance messages remaining after a reset require engineering investigation.

If you encounter an ECAM warning or caution that is not available on our website, please take a photo and send it to our Telegram.

Likewise, if you detect any discrepancies on the site, you can report them directly in our Telegram.

  • Рубрики
  • Social Icons

    Gallery